PUMPS INDIA

Asia's oldest and India's only exclusive bi-monthly magazine on pump industry • Over 2,25,000 readers across India & abroad • Get listed in our Directory • Subscribe to our FREE e-newsletter today! • Pumps India - Trusted Source Since 1994

ADNOC selects Celeros FT high pressure packages for Abu Dhabi

Celeros Flow Technology (Celeros FT) is supplying two high pressure injection packages to ADNOC for carbon capture and storage (CCS) at its Habshan gas plant in Abu Dhabi, United Arab Emirates.
Incorporating advanced pump technology from Celeros FT’s ClydeUnion Pumps brand, these supercritical CO2 injection packages will be among the largest in the world.
The project is part of ADNOC’s planned US$15 billion decarbonization investment in low-carbon solutions with the aim of decarbonizing their operations to reach Net Zero by 2050.
The CCS project is one of the largest in the MENA region, and ADNOC’s first for its oil and gas operations. It is designed to achieve a CCS capability of five million tonnes per annum by 2030. The Celeros FT pump packages will handle the captured supercritical CO2 from the ADNOC Gas (AG) Habshan facility and transport it by dedicated pipeline to the Bab Far North Full Field Development CO2 Storage Hub, which will serve as a junction point to receive supercritical CO2 from different suppliers and divert it to consumers within the Bab Far North FFD.
The two high pressure injection packages are part of the initial phase of the development. They will feature Celeros FT’s high pressure BB5 pump technology and include electric motors, variable frequency drives (VFDs), dry gas seal and dry gas seal systems. Each pump train will be capable of injecting 1.5 million tonnes of CO2 per annum, which equates to the carbon emissions of more than 326,000 vehicles. The contract will be fulfilled by Celeros FT’s ClydeUnion Pumps brand, with the skidded packages being assembled and string tested at its flagship site in Glasgow, Scotland.